Where do I start?

First Steps and Checklist to commissioning a Fre Energy Waste AD

  • Complete enquiry questionnaire

You have two options:

Complete an online questionnaire

Download the questionnaire as a PDF file. Please complete the form and post it to us.

  • Attend a Fre-energy seminar

To include:

A series of presentations detailing the various aspects of the Fre Energy Waste AD turnkey system including auto de-gritting and foam alleviation technology, remote management control system and tour of operational Fre Energy Waste AD at Lodge Farm.

  • Feasibility study

To determine:

  • Suitability of the site
  • Types of feedstock and availability on or near the site
  • Area of land available for pumping/spreading digestate
  • Is there a three phase connection?
  • Size and location of the nearest appropriate transformer
  • Optimum digester size for feedstock and potential power export
  • Scope potential planning issues
  • Scope potential environmental issues
  • Indicative Quote
 
  • Site Visit

To confirm:

  • Feedstock.
  • Location for Digester
  • Size of Digester
  • Options
  • Final Quote
  • Finance
  • Business Plan

To include:

  • Price of grid connection
  • Return on capital
  • Sensitivities
  • Confirm quote and place order
  • Site survey
  • Planning permission
  • Secure funding
  • Pay deposit
  • Order grid connection and metering
  • Mobilization
 

Please contact us if you require further information.